Video HLI Ecohub Nam Ha Construction Progress Update - April 2025
15/04/2025

Check out the latest images with Hoa Long Invest:
FACTORY ZONE:
- Installation of steel structure and concrete pouring for the mezzanine deck floor
- Installation of roof sheeting, boundary walls, and wall plastering
INFRASTRUCTURE:
- Stormwater drainage line installation: 65% complete
- Wastewater drainage line installation: Ongoing
AUXILIARY ZONE:
- Construction of underground fire protection water tank
- Installation of MEP system and ELV system